Expansion 2.0: Southwest cluster
This is a schematic representation of the current building lots. It is not possible to derive eligible addresses from the illustration. The City of Chemnitz is under no obligation to develop all addresses within the subsidised areas or construction areas.
| Start of construction: | 04/2025 |
| Planned end of construction: | 08/2027 |
| Address points to be developed: | 2.051 |
| Estimated total costs: | € 30.47 million |
| Expected funding (federal/state): | € 27.42 million |
| Expected own funds City of Chemnitz: | € 3.05 million |
| Operator / leaseholder: | eins energie in sachsen GmbH & Co KG |
| Planned start of lease: | 01.01.2029 |
| Planned end of lease: | 31.12.2035 |
| Technology used: | FTTB |
| Supply speed (target): | at least 1,000 Mbit/s |
Progress of the building works
Explanatory notes on the construction progress tables:
Construction completed
Refers to network distribution areas in which domestic connections have already been installed. Completion of construction does not yet mean the network is operational, as work may still be required on the upstream network. Operational (sub-)areas will be published separately upon completion.
Operational
The relevant network distribution area has been approved by the City of Chemnitz. This means that both the civil engineering works and the installation of the fibre-optic cables up to the fibre-optic termination point have been completed. The next stage involves the installation of the in-building fibre-optic cabling by contractors commissioned by eins energie in sachsen GmbH & Co. This may take several weeks. Individual customer activations are possible at any time once the roll-out of network level 4 has been completed for the relevant address.
in operation
The entire network distribution area is now operational, and individual customer activations can take place depending on the progress of the in-building fibre-optic cabling by eins energie in sachsen GmbH & Co. GmbH. Further information on availability can be found at www.eins.de.
| Planning | Under construction | Construction completed | Ready for operation | In operation | |
|---|---|---|---|---|---|
| Point of Presence 8 | |||||
| Mains distribution board 8.1 Waterway | in the planning stage | ||||
| Network distributor 8.2 Försterwinkel | in the planning stage | ||||
| Network distributor 8.11 Agricultural Road | in the planning stage | ||||
| Point of Presence 10 | |||||
| Mains distribution board 10.7 Eibenberger Straße | in the planning stage | ||||
| Point of Presence 26 | |||||
| Network distributor 26.2 Annaberger Straße, Neunzehnhainer Straße, Olbernhauer Straße, Schneeberger Straße | in the planning stage | under construction | |||
| Distribution substation 26.6 Annaberger Straße, Einsiedler Straße, Erfenschlager Straße | in planning | Under construction | Construction completed | ||
| Distribution substation 26.7 Annaberger Straße, Erfenschlager Straße, Schneeberger Straße, Schulstraße | In planning | Under construction | Construction completed | ||
| Distribution substation 26.11 Annaberger Straße, Scheffelstraße, Schulstraße | In the planning stage | ||||
| Network distribution point 26 December Annaberger Straße, Scheffelstraße, Uhlestraße, Werner-Seelenbinder-Straße | in planning | under construction | |||
| Point of Presence 27 | |||||
| Network Distributor 27.1 Harthauer Straße, Joachim-Kändler-Straße, Permoserstraße, Rietschelstraße | in planning | Under construction | Construction completed | ||
| Distribution substation 27.2 Feudelstraße, Försterwinkel, Gießereiweg | In planning | under construction | Construction completed | ||
| Distribution substation 27.3 Feudelstraße, Gießereiweg, Harthauer Straße | In planning | Under construction | Construction completed | ||
| Distribution substation 27.5 At Schindlerberg, Annaberger Straße | In the planning stage | under construction | |||
| Distribution substation 27.9 Alte Harth, Annaberger Straße, Hübnerweg | in the planning stage | under construction | |||
| Distribution substation 27.10 Annaberger Straße, Steinweg | in planning | Under construction | Construction completed | ||
| Distribution substation 27 November Annaberger Straße, Friedrichstraße, Hedwigstraße, Würtschnitzweg | In planning | Under construction | Construction completed | ||
| Distribution substation 27 December Albert-Schenk-Straße, Fuchsweg, Klaffenbacher Straße, Spinnereiweg | In planning | Under construction | Construction completed | ||
| Distribution substation 27.17 Annaberger Straße | in the planning stage | ||||
| Point of Presence 29 | |||||
| Distribution substation area 29.1 Fuchsweg | in the planning stage | under construction | |||
| Point of Presence 30 | |||||
| Network distribution area 30.1 At Silberbach | in the planning stage | ||||
| Point of Presence 32 | |||||
| Network distribution area 32.1 Kicheck | in the planning stage | under construction | |||
| Distribution substation area 32.2 Adorfer Straße, Kicheck | in the planning stage | under construction | |||
| Distribution substation area 32.3 Adorfer Straße; Kircheck | in the planning stage |
| Planning | Under construction | Construction completed | Ready for operation | In operation | |
|---|---|---|---|---|---|
| Point of Presence 33 | |||||
| Mains distribution board 33.4 Eichhörnchensteig; Johann-Richter-Straße; Meisenweg; Stollberger Straße | in the planning stage | ||||
| Network distribution point 33.6 Bruno-Granz-Straße; Ellenbogen; Markersdorfer Straße; Max-Türpe-Straße; Südblick | in planning | Under construction | Construction completed | ||
| Distribution substation 33.7 Max-Türpe-Straße | In planning | under construction | |||
| Network distribution point 33.8 Am Rummel; Markersdorfer Straße | in planning | under construction | |||
| Distribution substation 33.10 Hohe Warte; Neukirchner Straße; Stollberger Straße | in planning | under construction | |||
| Distribution substation 33.12 At the Luthereiche; Neukirchner Straße; Schaftreibe; Siedlerstraße | in the planning stage | Under construction | Construction completed | ||
| Distribution substation 33.16 Jagdschänkenstraße; Neukirchner Straße; Stelzendorfer Straße | In planning | Under construction | Construction completed | ||
| Network distribution point 33.18 Borngasse; Stelzendorfer Straße; Teichweg | In planning | under construction | |||
| Distribution substation 33.19 Stelzendorfer Gutsweg; Stelzendorfer Straße | in planning | under construction | |||
| Distribution substation 33.20 Stelzendorfer Straße | in the planning stage | under construction | |||
| Network substation 33.21 Stelzendorfer Straße; Südring | in the planning stage | under construction | |||
| Point of Presence 34 | |||||
| Mains distribution board 34.1 Lützowstraße; Neefestraße | in the planning stage | ||||
| Distribution substation 34.9 Clemens-Winkler-Straße: Friedhofstraße; Stelzendorfer Straße | in planning | under construction | |||
| Point of Presence 35 | |||||
| Distribution substation area 35.2 Adam-Ries-Straße; Jagdschänkenstraße | in the planning stage | under construction | |||
| Distribution substation area 35.3 Adam-Ries-Straße; Am Siegmarer Bahnhof; Curiestraße; Jagdschänkenstraße | in the planning stage | under construction | |||
| Distribution substation area 35.4 Curiestraße; Otto-Schmerbach-Straße | in planning | under construction | |||
| Distribution substation area 35.6 Carl-von-Bach-Straße; Jagdschänkenstraße; Mauersberger Straße; Tuchschererstraße | in the planning stage | ||||
| Distribution substation area 35.7 Jagdschänkenstraße; Neue Straße; Otto-Schmerbach-Straße; Talstraße | in planning | under construction | |||
| Point of Presence 36 | |||||
| Distribution substation area 36.2 Am Wiesenbach; Rungestraße; Zwickauer Straße | in the planning stage | under construction | |||
| Distribution substation area 36.3 Bachgasse; Zwickauer Straße | in the planning stage | under construction | |||
| Distribution substation area 36.4 Karl-Seibt-Straße; Mitschurinstraße; Pawlowstraße; Zwickauer Straße | in planning | under construction | |||
| Distribution substation area 36.15 Am Wiesenbach; Rosenweg; Zwickauer Straße | in planning | under construction | |||
| Point of Presence 37 | |||||
| Distribution substation area 37.1 Hofer Straße (Mittelbach); Neefstraße; Zwickauer Straße | in the planning stage | ||||
| Distribution substation area 37.5 Grünaer Straße; Hofer Straße; Mittelbacher Dorfstraße | in the planning stage | ||||
| Distribution substation area 37.6 Hofer Straße (Mittelbach); Mittelbacher Dorfstraße; Querstraße | in the planning stage | ||||
| Distribution substation area 37.8 Hofer Straße (Mittelbach); Mittelbacher Dorfstraße; Steinbachs Weg | in the planning stage | ||||
| Network distribution area 37.13 Landgraben | in the planning stage | ||||
| Distribution substation area 37.18 Aktienstraße; Mittelbacher Dorfstraße | in the planning stage | ||||
| Distribution substation area 37.19 Aktienstraße | in the planning stage | ||||
| Distribution area 37.20 Aktienstraße; An der Wiesenmühle; Grünaer Straße; Karlstraße; Mittelbacher Dorfstraße; Poststraße; Schachtweg | in planning | under construction | |||
| Distribution substation area 37.21 At the Wiesenmühle; Chemnitzer Straße; Reichenbrander Straße | in the planning stage |