Notice from the City of Chemnitz regarding the implementation of the Federal Clean Air Act
Public Notice: Retrospective Order pursuant to Section 17(1a) in conjunction with Section 10(3) and (4), Nos. 1 and 2, of the Federal Immission Control Act (BImSchG)
Project: Construction and operation of two wind turbines in Kleinolbersdorf-Altenhain
Notice of the re-approval of the JUWI GmbH project – wind turbines in Kleinolbersdorf-Altenhain
Approval
Implementation of the Environmental Impact Assessment Act
Information on the fire salamander - monitoring 2025 to 2028 in the city of Chemnitz
As part of the Natural Heritage - Studies for the Documentation of Species and Habitat Types funding guideline, the Bund für Umwelt und Naturschutz Deutschland (BUND), Landesverband Sachsen e.V. is investigating the occurrence of the fire salamander(Salamandra salamandra) and its larvae along selected watercourses in the districts of Zwickau, Central Saxony, the Erzgebirgskreis and the urban area of Chemnitz.
The aim of the project is to record the populations of this amphibian species, analyse their vitality and reproductive success and derive protective measures - particularly for the ecological enhancement of small watercourses.
On the basis of Section 37 (2) SächsNatSchG, employees and representatives of the nature conservation authorities, the specialist authorities, the municipalities and the police are authorised to enter properties or drive on suitable paths during daylight hours in order to prepare and implement nature conservation and landscape management measures. Within the scope of sentence 1, they are also authorised to carry out surveys, nature conservation observations, measurements and soil investigations as well as similar official business. The time of day is from 6.00 am to 10.00 pm. Land in the open countryside or in the forest may also be entered by the group of persons named in sentence 1 for nature conservation observations during the night, whereby disturbance of hunting activities must be avoided.
In accordance with Section 37 (2) SächsNatSchG, landowners and other authorised persons must be notified. As the surveys carried out as part of the above-mentioned investigations cover a large number of properties, notification will take the form of a public announcement.
BUND Landesverband Sachsen e.V. is carrying out the following measures in the districts of Grüna, Hilbersdorf and Chemnitz with its own staff between 2025 and 2028:
- Collection of data on habitat types of the FFH Directive
- Collection of data on the occurrence of the species "Salamandra salamandra" in streams and waterside areas
- Collection of data on the occurrence of the species "Salamandra salamandra" in the land habitat
- Determination of water quality chemically/physically, in individual cases macrozoobenthos determination on watercourses in the study area
BUND Landesverband Sachsen e.V.
Fire salamander project
Contact person: Heidi Enderlein
Street of Nations 122, 09111 Chemnitz
E-mail: heidi.enderlein(at)bund-sachsen.de
Further information at: www.bund-sachsen.de/feuersalamander
Permanent announcements
Ordinance on Medium-Sized Combustion, Gas Turbine and Internal Combustion Engine Installations – 44th BImSchV
The Regulation came into force on 20 June 2019. In addition to complying with technical and metrological requirements for air quality control, the Regulation requires operators of the relevant installations to report certain matters to the competent air pollution control authority.
These include:
Notification of new installations prior to commissioning
Notification of existing installations (commissioned before or on 20 December 2018)
Notification of changes affecting emissions prior to their implementation
Notification of a change of operator, without delay, but no later than within one month
Notification of permanent decommissioning, without delay, but no later than within one month
The notification procedure is regulated uniformly throughout the Free State of Saxony. The Ordinance on Medium-Sized Combustion, Gas Turbine and Internal Combustion Engine Installations (44th BImSchV), the general ruling on the 44th BImSchV and the notification form are available via the following link:
In accordance with Section 36 of the 44th BImSchV, the competent authorities maintain a register of installations: