Expansion 2.0: Cluster East
This is a schematic representation of the current building lots. It is not possible to derive eligible addresses from the illustration. The City of Chemnitz is under no obligation to develop all addresses within the subsidised areas or construction areas.
| Start of construction: | October 2025 |
| Planned completion date: | December 2029 |
| Number of properties to be connected: | 4.154 |
| Estimated total cost: | €46.94 million |
| Estimated funding (federal/state): | €42.25 million |
| Estimated own funds from the City of Chemnitz: | €4.69 million |
| Operator / Lessee: | eins energie in sachsen GmbH & Co. KG |
| Planned start of lease: | 1 January 2030 |
| Planned end of lease: | 3112 December 2036 |
| Technology used: | FTTB |
| Service speed (target): | at least 1,000 Mbit/s |
Progress of the building works
Explanatory notes on the construction progress tables:
Construction completed
Refers to network distribution areas in which domestic connections have already been installed. Completion of construction does not yet mean the network is operational, as work may still be required on the upstream network. Operational (sub-)areas will be published separately upon completion.
Operational
The relevant network distribution area has been approved by the City of Chemnitz. This means that both the civil engineering works and the installation of the fibre-optic cables up to the fibre-optic termination point have been completed. The next stage involves the installation of the in-building fibre-optic cabling by contractors commissioned by eins energie in sachsen GmbH & Co. This may take several weeks. Individual customer activations are possible at any time once the roll-out of network level 4 has been completed for the relevant address.
in operation
The entire network distribution area is now operational, and individual customer activations can take place depending on the progress of the in-building fibre-optic cabling by eins energie in sachsen GmbH & Co. GmbH. Further information on availability can be found at www.eins.de.
| Planning | Under construction | Construction completed | Ready for operation | In operation | |
|---|---|---|---|---|---|
| Point of Presence 14 | |||||
| Network Distributor 14.2 Adalbert-Stifter-Weg; Along the Riesa railway line; Further Höhe; Glösaer Straße | in the planning stage | ||||
| Distribution substation 14.6 Am Schnellen Markt; Frankenberger Straße; Herwehgstraße; Lichtenwalder Straße | in the planning stage | ||||
| Distribution substation 14.9 Ebersdorfer Straße; Frankenberger Straße; Krügerstraße | in the planning stage | ||||
| Distribution substation 14.11 Agricolastraße; Frankenberger Straße; Glösaer Straße; Huttenstraße; Lichtenwalder Straße | in the planning stage | ||||
| Point of Presence 15 | |||||
| Mains distribution board 15.9 Eberhardtsteig; Mittweidaer Straße; Silchstraße | in the planning stage | ||||
| Network distribution centre 15 December Mittweidaer Straße | in planning | under construction | |||
| Distribution substation 15.13 Mittweidaer Straße | in the planning stage | under construction | |||
| Network distribution substation 15.16 Mittweidaerstraße; Ortelsdorfer Straße | in the planning stage | ||||
| Network distributor 15.17 Ortelsdorfer Straße | in the planning stage | ||||
| Distribution substation 15.18 Ebersdorfer Höhe; Frankenberger Straße | in the planning stage | ||||
| Network distribution point 15.19 Max-Saupe-Straße | in the planning stage | Under construction | Construction completed | ||
| Network distribution point 15.20 On the Riesa railway line; Tännichtleite | In planning | under construction | |||
| Network distribution point 15.21 At Knie; on the Riesa railway line; Stiftsweg | in planning | Under construction | |||
| Network distribution point 15.22 At the bend; Stiftsweg | in the planning stage | under construction |
| Planning | Under construction | Construction completed | Operational | in operation | |
|---|---|---|---|---|---|
| Point of Presence 13 | |||||
| Network distribution point 13.1 Blankenauer Straße; Chemnitztalstraße | in planning | ||||
| Point of Presence 16 | |||||
| Network distribution point 16.1 Emilienstraße; Frankenberger Straße | in planning | ||||
| Distribution substation 16.2 On the Riesa railway line | in planning | ||||
| Network distribution point 16.3 Dresdner Straße: Forststraße; Hohlweg | in planning | ||||
| Distribution substation 16.4 August-Bebel-Straße; Dresdner Straße; Palmstraße; Thomas-Mann-Platz | in planning | ||||
| Network distribution point 16.5 Dresdner Straße; Forststraße; Gellertstraße; Hainstraße; Palmstraße; Zietenstraße | in planning | ||||
| Distribution substation 16.6 Heinrich-Schütz-Straße; Hofer Straße; Paul-Gerhardt-Straße; Planitzwiese | in planning |
| Planning | Under construction | Construction completed | Ready for operation | In operation | |
|---|---|---|---|---|---|
| Point of Presence 6 | |||||
| Mains distribution board 6.1 Main Road | in the planning stage | ||||
| Point of Presence 7 | |||||
| Mains distribution board 7.3 Hugo-Pöschmann-Straße | in the planning stage | ||||
| Network distributor 7.6 Mittagleite | in the planning stage | ||||
| Network Distributor 7.20 Marktsteig, Mittagleite | in the planning stage | under construction | |||
| Point of Presence 18 | |||||
| Distribution substation area 18.1 Eubaer Straße | in the planning stage | ||||
| Distribution substation area 18.3 Augustusburger Straße, Eubaer Straße | in the planning stage | ||||
| Distribution substation area 18.5 Olbersdorfer Straße | in the planning stage | ||||
| Distribution substation area 18.10 Adelsbergstraße | in the planning stage | ||||
| Distribution substation area 18.17 Dreiserstraße | in the planning stage | ||||
| Distribution substation area 18.19 Reinhard-Uhlig-Straße | in the planning stage | ||||
| Distribution substation area 18.21 Cervantesstraße | in the planning stage | ||||
| Distribution substation area 18.23 Cervantesstraße | in the planning stage | ||||
| Point of Presence 19 | |||||
| Distribution substation area 19.2 Dreiserstraße, Georgistraße | in the planning stage | ||||
| Network distribution area 19.6 Georgistraße | in the planning stage | ||||
| Distribution substation area 19.7 Barbussestraße, Kleiner Weg, Otto-Thörner-Straße | in the planning stage | ||||
| Distribution substation area 19.8 Adelsbergstraße, Breitenlehn, Kirchwinkel | in the planning stage | ||||
| Distribution substation area 19.10 Adelsbergweg, Breitenlehn | in the planning stage | ||||
| Distribution substation area 19.11 Adelsbergstraße | in the planning stage | ||||
| Distribution substation area 19.12 Adelsbergstraße; Hermersdorfer Straße; Kleinolbersdorfer Straße | in the planning stage | ||||
| Distribution substation area 19.13 At Schösserholz | in the planning stage | under construction | |||
| Distribution substation 19.14 At Schösserholz | in the planning stage | ||||
| Network distribution area 19.31 Detection path | in the planning stage | ||||
| Point of Presence 20 | |||||
| Network distribution area 20.4 Marktsteig, Richterweg | in the planning stage | ||||
| Distribution substation area 20.11 Gornauer Straße | in planning | under construction | Construction completed | ||
| Distribution substation area 20.12 Gornauer Straße | In the planning stage | under construction | |||
| Distribution substation area 20.13 Reichenhainer Mühlberg | in the planning stage | Under construction | Construction completed | ||
| Distribution substation area 20.14 Reichenhainer Mühlberg | In planning | Under construction | Construction completed | ||
| Distribution substation area 20.15 Reichenhainer Mühlberg | In planning | under construction | |||
| Distribution substation area 20.17 Erfenschlager Straße | in the planning stage | ||||
| Distribution substation area 20.21 Sayder Straße | in the planning stage | under construction |
| Planning | Under construction | Construction completed | Ready for operation | In operation | |
|---|---|---|---|---|---|
| Point of Presence 9 | |||||
| Network distributor 9.5 To Spitzberg; Altenhainer Dorfstraße | in the planning stage | ||||
| Point of Presence 22 | |||||
| Mains distribution board 22.1 Bernhard-Kuhnt-Weg; Schöne Aussicht; Zschopauer Straße | in planning | Under construction | Construction completed | ||
| Distribution substation 22.2 Bernhard-Kuhnt-Weg; Lehmgrubenweg; Max-Brand-Straße | In the planning stage | under construction | Construction completed | ||
| Network distribution point 22.3 Am Gehege; Gartenstadt | in the planning stage | ||||
| Network distribution point 22.6 Ferdinandstraße; Schillerstraße | in the planning stage | ||||
| Network distributor 22.14 Am Finsterbusch; Ferdinandstraße | in the planning stage | ||||
| Network distribution point 22.15 Ferdinandstraße | in the planning stage | ||||
| Network distributor 22.16 Shakespearstraße; Zschopauer Straße | in planning | under construction | |||
| Distribution substation 22.18 Altenhainer Dorfstraße; Zschopauer Straße | in planning | under construction | |||
| Distribution substation 22.20 Einsiedler Weg; Zschopauer Straße | in planning | Under construction | Construction completed | ||
| Distribution substation 22.21 Altenhainer Dorfstraße; Am Winkel; Einsiedler Weg | in the planning stage | ||||
| Distribution substation 22.22 Altenhainer Dorfstraße; Baumeister-Uhlig-Straße | in the planning stage | ||||
| Network distribution point 22.23 Altenhainer Dorfstraße; Zum Spitzberg | in the planning stage |
| Planning | Under construction | Construction completed | Ready for operation | In operation | |
|---|---|---|---|---|---|
| Point of Presence 1 | |||||
| Network Distributor 1.2 Untere Hauptstraße; Waldweg | in the planning stage | ||||
| Network distribution point 1.16 Obere Hauptstraße | in the planning stage | ||||
| Mains distributor 1.28 Querweg | in the planning stage | ||||
| Point of Presence 49 | |||||
| Mains distribution board 49.1 Bornaer Straße; Sandstraße | in the planning stage | ||||
| Distribution substation 49.2 Auerswalder Straße; Bornaer Straße | in the planning stage | ||||
| Distribution substation 49.3 Auerswalder Straße; Hermann-Löns-Straße | in the planning stage | under construction | |||
| Network substation 49.5 Damaschkestraße; Hermann-Löns-Straße | in the planning stage | Under construction | Construction completed | ||
| Distribution substation 49.6 Bornaer Straße; Damaschkestraße; Heinersdorfer Straße | In planning | under construction | |||
| Distribution substation 49.7 An der Hofewiese; Blankenburgstraße; Bornaer Straße | in the planning stage | ||||
| Network substation 49.8 Bornaer Straße; Sandstraße | in the planning stage | ||||
| Distribution substation 49.9 In der Delle; Draisdorfer Straße; Blankenburgstraße | in planning | under construction | |||
| Distribution substation 49.10 Draisdorfer Straße; Zu den Pappeln | in planning | under construction | |||
| Network distribution point 49.11 Draisdorfer Straße; In der Delle | in the planning stage | under construction | |||
| Distribution substation 49.12 Blankenburgstraße; Draisdorfer Straße | in the planning stage | ||||
| Network distributor 49.13 Glücksberg; In der Delle | in the planning stage | under construction | |||
| Network distribution point 49.14 Glücksberg; In der Delle | in the planning stage | ||||
| Point of Presence 50 | |||||
| Mains distributor 50.1 On the Bahre slope | in the planning stage | under construction | |||
| Distribution substation 50.2 Heinersdorfer Straße | in the planning stage | ||||
| Distribution substation 50.3 On the Bahrebach; Heinersdorfer Straße | in the planning stage | ||||
| Network distributor 50.6 On Bahrehang; towards Kornweg | in the planning stage | under construction | |||
| Network distribution point 50.7 On the railway embankment | in the planning stage | under construction | |||
| Point of Presence 51 | |||||
| Mains distribution board 51.1 Chemnitztalstraße | in the planning stage | ||||
| Point of Presence 52 | |||||
| Mains distribution board 52.2 Chemnitztalstraße; Untere Hauptstraße; Waldweg 1 | in the planning stage |