Expansion 2.0: Cluster East

This is a schematic representation of the current building lots. It is not possible to derive eligible addresses from the illustration. The City of Chemnitz is under no obligation to develop all addresses within the subsidised areas or construction areas.

Übersicht Fördergebiet Ost
Picture: Stadt Chemnitz / TKI
Start of construction:October 2025
Planned completion date:December 2029
Number of properties to be connected:4.154
Estimated total cost:€46.94 million
Estimated funding (federal/state):€42.25 million
Estimated own funds from the City of Chemnitz:€4.69 million
Operator / Lessee:eins energie in sachsen GmbH & Co. KG
Planned start of lease:1 January 2030
Planned end of lease:3112 December 2036
Technology used:FTTB
Service speed (target):at least 1,000 Mbit/s

Contract lots 2 and 3

AYTAC Bau GmbH logo

Contract Lot 4

'Swing & Cut' logo

Lot 6

EIFFAGE Infra-Bau logo

Contract Lot 10

RAC logo

Progress of the building works

Explanatory notes on the construction progress tables:

Construction completed
Refers to network distribution areas in which domestic connections have already been installed. Completion of construction does not yet mean the network is operational, as work may still be required on the upstream network. Operational (sub-)areas will be published separately upon completion.

Operational
The relevant network distribution area has been approved by the City of Chemnitz. This means that both the civil engineering works and the installation of the fibre-optic cables up to the fibre-optic termination point have been completed. The next stage involves the installation of the in-building fibre-optic cabling by contractors commissioned by eins energie in sachsen GmbH & Co. This may take several weeks. Individual customer activations are possible at any time once the roll-out of network level 4 has been completed for the relevant address.

in operation
The entire network distribution area is now operational, and individual customer activations can take place depending on the progress of the in-building fibre-optic cabling by eins energie in sachsen GmbH & Co. GmbH. Further information on availability can be found at www.eins.de.

PlanningUnder constructionConstruction completedReady for operationIn operation
Point of Presence 14
Network Distributor 14.2
Adalbert-Stifter-Weg; Along the Riesa railway line; Further Höhe; Glösaer Straße
in the planning stage
Distribution substation 14.6
Am Schnellen Markt; Frankenberger Straße; Herwehgstraße; Lichtenwalder Straße
in the planning stage
Distribution substation 14.9
Ebersdorfer Straße; Frankenberger Straße; Krügerstraße
in the planning stage
Distribution substation 14.11
Agricolastraße; Frankenberger Straße; Glösaer Straße; Huttenstraße;
Lichtenwalder Straße
in the planning stage
Point of Presence 15
Mains distribution board 15.9
Eberhardtsteig; Mittweidaer Straße; Silchstraße
in the planning stage
Network distribution centre 15 December
Mittweidaer Straße
in planningunder construction
Distribution substation 15.13
Mittweidaer Straße
in the planning stageunder construction
Network distribution substation 15.16
Mittweidaerstraße; Ortelsdorfer Straße
in the planning stage
Network distributor 15.17
Ortelsdorfer Straße
in the planning stage
Distribution substation 15.18
Ebersdorfer Höhe; Frankenberger Straße
in the planning stage
Network distribution point 15.19
Max-Saupe-Straße
in the planning stageUnder constructionConstruction completed
Network distribution point 15.20
On the Riesa railway line; Tännichtleite
In planningunder construction
Network distribution point 15.21
At Knie; on the Riesa railway line; Stiftsweg
in planningUnder construction
Network distribution point 15.22
At the bend; Stiftsweg
in the planning stageunder construction
 PlanningUnder constructionConstruction completedOperationalin operation
Point of Presence 13     
Network distribution point 13.1
Blankenauer Straße; Chemnitztalstraße
in planning    
      
Point of Presence 16     
Network distribution point 16.1
Emilienstraße; Frankenberger Straße
in planning    
Distribution substation 16.2
On the Riesa railway line
in planning    
Network distribution point 16.3
Dresdner Straße: Forststraße; Hohlweg
in planning    
Distribution substation 16.4
August-Bebel-Straße; Dresdner Straße; Palmstraße; Thomas-Mann-Platz
in planning    
Network distribution point 16.5
Dresdner Straße; Forststraße; Gellertstraße; Hainstraße; Palmstraße; 
Zietenstraße
in planning    
Distribution substation 16.6
Heinrich-Schütz-Straße; Hofer Straße; Paul-Gerhardt-Straße; Planitzwiese
in planning    
PlanningUnder constructionConstruction completedReady for operationIn operation
Point of Presence 6
Mains distribution board 6.1
Main Road
in the planning stage
Point of Presence 7
Mains distribution board 7.3
Hugo-Pöschmann-Straße
in the planning stage
Network distributor 7.6
Mittagleite
in the planning stage
Network Distributor 7.20
Marktsteig, Mittagleite
in the planning stageunder construction
Point of Presence 18
Distribution substation area 18.1
Eubaer Straße
in the planning stage
Distribution substation area 18.3
Augustusburger Straße, Eubaer Straße
in the planning stage
Distribution substation area 18.5
Olbersdorfer Straße
in the planning stage
Distribution substation area 18.10
Adelsbergstraße
in the planning stage
Distribution substation area 18.17
Dreiserstraße
in the planning stage
Distribution substation area 18.19
Reinhard-Uhlig-Straße
in the planning stage
Distribution substation area 18.21
Cervantesstraße
in the planning stage
Distribution substation area 18.23
Cervantesstraße
in the planning stage
Point of Presence 19
Distribution substation area 19.2
Dreiserstraße, Georgistraße
in the planning stage
Network distribution area 19.6
Georgistraße
in the planning stage
Distribution substation area 19.7
Barbussestraße, Kleiner Weg, Otto-Thörner-Straße
in the planning stage
Distribution substation area 19.8
Adelsbergstraße, Breitenlehn, Kirchwinkel
in the planning stage
Distribution substation area 19.10
Adelsbergweg, Breitenlehn
in the planning stage
Distribution substation area 19.11
Adelsbergstraße
in the planning stage
Distribution substation area 19.12
Adelsbergstraße; Hermersdorfer Straße; Kleinolbersdorfer Straße
in the planning stage
Distribution substation area 19.13
At Schösserholz
in the planning stageunder construction
Distribution substation 19.14
At Schösserholz
in the planning stage
Network distribution area 19.31
Detection path
in the planning stage
Point of Presence 20
Network distribution area 20.4
Marktsteig, Richterweg
in the planning stage
Distribution substation area 20.11
Gornauer Straße
in planningunder constructionConstruction completed
Distribution substation area 20.12
Gornauer Straße
In the planning stageunder construction
Distribution substation area 20.13
Reichenhainer Mühlberg
in the planning stageUnder constructionConstruction completed
Distribution substation area 20.14
Reichenhainer Mühlberg
In planningUnder constructionConstruction completed
Distribution substation area 20.15
Reichenhainer Mühlberg
In planningunder construction
Distribution substation area 20.17
Erfenschlager Straße
in the planning stage
Distribution substation area 20.21
Sayder Straße
in the planning stageunder construction
PlanningUnder constructionConstruction completedReady for operationIn operation
Point of Presence 9
Network distributor 9.5
To Spitzberg; Altenhainer Dorfstraße
in the planning stage
Point of Presence 22
Mains distribution board 22.1
Bernhard-Kuhnt-Weg; Schöne Aussicht; Zschopauer Straße
in planningUnder constructionConstruction completed
Distribution substation 22.2
Bernhard-Kuhnt-Weg; Lehmgrubenweg; Max-Brand-Straße
In the planning stageunder constructionConstruction completed
Network distribution point 22.3
Am Gehege; Gartenstadt
in the planning stage
Network distribution point 22.6
Ferdinandstraße; Schillerstraße
in the planning stage
Network distributor 22.14
Am Finsterbusch; Ferdinandstraße
in the planning stage
Network distribution point 22.15
Ferdinandstraße
in the planning stage
Network distributor 22.16
Shakespearstraße; Zschopauer Straße
in planningunder construction
Distribution substation 22.18
Altenhainer Dorfstraße; Zschopauer Straße
in planningunder construction
Distribution substation 22.20
Einsiedler Weg; Zschopauer Straße
in planningUnder constructionConstruction completed
Distribution substation 22.21
Altenhainer Dorfstraße; Am Winkel; Einsiedler Weg
in the planning stage
Distribution substation 22.22
Altenhainer Dorfstraße; Baumeister-Uhlig-Straße
in the planning stage
Network distribution point 22.23
Altenhainer Dorfstraße; Zum Spitzberg
in the planning stage
PlanningUnder constructionConstruction completedReady for operationIn operation
Point of Presence 1
Network Distributor 1.2
Untere Hauptstraße; Waldweg
in the planning stage
Network distribution point 1.16
Obere Hauptstraße
in the planning stage
Mains distributor 1.28
Querweg
in the planning stage
Point of Presence 49
Mains distribution board 49.1
Bornaer Straße; Sandstraße
in the planning stage
Distribution substation 49.2
Auerswalder Straße; Bornaer Straße
in the planning stage
Distribution substation 49.3
Auerswalder Straße; Hermann-Löns-Straße
in the planning stageunder construction
Network substation 49.5
Damaschkestraße; Hermann-Löns-Straße
in the planning stageUnder constructionConstruction completed
Distribution substation 49.6
Bornaer Straße; Damaschkestraße; Heinersdorfer Straße
In planningunder construction
Distribution substation 49.7
An der Hofewiese; Blankenburgstraße; Bornaer Straße
in the planning stage
Network substation 49.8
Bornaer Straße; Sandstraße
in the planning stage
Distribution substation 49.9
In der Delle; Draisdorfer Straße; Blankenburgstraße
in planningunder construction
Distribution substation 49.10
Draisdorfer Straße; Zu den Pappeln
in planningunder construction
Network distribution point 49.11
Draisdorfer Straße; In der Delle
in the planning stageunder construction
Distribution substation 49.12
Blankenburgstraße; Draisdorfer Straße
in the planning stage
Network distributor 49.13
Glücksberg; In der Delle
in the planning stageunder construction
Network distribution point 49.14
Glücksberg; In der Delle
in the planning stage
Point of Presence 50
Mains distributor 50.1
On the Bahre slope
in the planning stageunder construction
Distribution substation 50.2
Heinersdorfer Straße
in the planning stage
Distribution substation 50.3
On the Bahrebach; Heinersdorfer Straße
in the planning stage
Network distributor 50.6
On Bahrehang; towards Kornweg
in the planning stageunder construction
Network distribution point 50.7
On the railway embankment
in the planning stageunder construction
Point of Presence 51
Mains distribution board 51.1
Chemnitztalstraße
in the planning stage
Point of Presence 52
Mains distribution board 52.2
Chemnitztalstraße; Untere Hauptstraße; Waldweg 1
in the planning stage