Expansion 2.0: Northwest cluster

This is a schematic representation of the current building lots. It is not possible to derive eligible addresses from the illustration. The City of Chemnitz is under no obligation to develop all addresses within the subsidised areas or construction areas.

Übersicht Fördergebiet Nord-West
Picture: Stadt Chemnitz / TKI
Start of construction:03.03.2025
Planned end of construction:IV/2028
Address points to be developed:2.696
Estimated total costs:€ 36.88 million
Expected funding (federal/state):€ 33.19 million
Expected own funds City of Chemnitz:€ 3.69 million
Operator / leaseholder:eins energie in sachsen GmbH & Co KG
Planned start of lease:01.01.2029
Planned end of lease:31.12.2035
Technology used:FTTB
Supply speed (target):at least 1,000 Mbit/s

Lot 8

Logo of the company "ALCON Bauunternehmung GmbH"

Lot 9

Logo of the company "Umwelt.2000 Umweltbau und Recyclingtechnik"

Progress of the building works

Explanatory notes on the construction progress tables:

Construction completed
Refers to network distribution areas in which domestic connections have already been installed. Completion of construction does not yet mean the network is operational, as work may still be required on the upstream network. Operational (sub-)areas will be published separately upon completion.

Operational
The relevant network distribution area has been approved by the City of Chemnitz. This means that both the civil engineering works and the installation of the fibre-optic cables up to the fibre-optic termination point have been completed. The next stage involves the installation of the in-building fibre-optic cabling by contractors commissioned by eins energie in sachsen GmbH & Co. This may take several weeks. Individual customer activations are possible at any time once the roll-out of network level 4 has been completed for the relevant address.

in operation
The entire network distribution area is now operational, and individual customer activations can take place depending on the progress of the in-building fibre-optic cabling by eins energie in sachsen GmbH & Co. GmbH. Further information on availability can be found at www.eins.de.

PlanningUnder constructionConstruction completedReady for operationIn operation
Point of Presence 38
Network distribution point 38.2
Friedhofstraße; Robert-Blum-Straße; Zwickauer Straße
in the planning stageUnder constructionConstruction completed
Distribution substation 38.4
Färbergasse; Gustav-Wünsch-Straße; Zwickauer Straße
in the planning stage
Network distribution point 38.6
Eichelbergweg; Gustav-Wünsch-Straße; Walthergasse; Zwickauer Straße
in the planning stage
Distribution substation 38.8
Bahnstraße; Carl-Hertel-Straße; Mühlgasse; Popowstraße; Zwickauer Straße
in the planning stage
Distribution substation 38.9
Einsteinstraße; Mühlgasse; Zwickauer Straße
in the planning stage
Network distribution point 38.10
Kohlstraße; Zwickauer Straße
in the planning stage
Network distribution point 38.11
Am Feldschlößchen; Steinstraße; Zwickauer Straße
in the planning stage
Network distribution point 38.13
Goethestraße; Herberstraße; Lützowstraße; Zwickauer Straße
in the planning stageunder construction
Point of Presence 41
Mains distribution board 41.4
Kaufmannstraße; Meyerstraße; Oberfrohnaer Straße
in the planning stage
Network distribution point 41.6
Nevoigtstraße
in planningunder construction
Distribution substation 41.7
At Unritzbach; Nevoigtstraße; Unritzstraße
in the planning stage
Network distribution point 41.8
An den alten Lehden; Pelzmühlenstraße; Rabensteiner Straße; Unritzstraße
in the planning stageunder construction
Network distribution point 41.11
Bauernweg; Riedbachweg; Riedstraße; Unritzstraße
in planningunder construction
Distribution substation 41.13
Boettcherstraße; Kalkstraße; Oberfrohnaer Straße; Pelzmühöenstraße; Trützschlerstraße; Wilhelm-Wolff-Straße
in the planning stage
Point of Presence 42
Distribution substation area 42.1
Am alten Weinberg; Rabensteiner Straße; Riedstraße; Schaftreiberweg
in the planning stageunder construction
Distribution substation area 42.2
Rabensteiner Straße; Teichstraße
in the planning stage
Distribution area 42.3
Am Bretteich; Am Poltermühlenteich; Dorfstraße; Grenzweg; Ringstraße
in planningunder construction
Distribution substation area 42.4
Dorfstraße; Mühlenstraße; Ringstraße
in planningunder construction
Distribution substation area 42.6
Bachgasse; Dorfstraße; Limbacher Straße
in the planning stage
Distribution substation area 42.9
Am Hexenberg; Dornröschenweg; Limbacher Straße
in planningUnder constructionConstruction completed
Distribution substation area 42.11
Drachenweg; Limbacher Straße; Rabensteiner Straße; Röhrsdorfer Straße
In planningUnder constructionConstruction completed
Point of Presence 43
Distribution substation area 43.19
Baumgartenstraße; Lessingstraße; Lutherstraße
in the planning stageUnder constructionConstruction completed
Distribution substation area 43.22
Totenstein
In planningunder constructionConstruction completed
Point of Presence 44
Distribution substation area 44.5
Dorfbachgasse; Kieselhausenstraße; Limbacher Straße; Sandsteig
in planning
Distribution substation area 44.6
Kieselhausenstraße
in the planning stage
Distribution substation area 44.10
Boettcherstraße; Georgenkirchweg; Harthweg
in the planning stageunder construction
Distribution substation area 44.24
Ahnertstraße; Antonstraße; Oberfrohnaer Straße; Riedstraße
in the planning stage
Distribution substation area 44.25
At Kalkwiesenteich; Antonstraße; Georgenkirchweg
in planningunder construction
Distribution substation area 44.28
Georgenkirchweg; Georg-Weerth-Straße; Rittergutsweg
in the planning stage
PlanningUnder constructionConstruction completedReady for operationIn operation
Point of Presence 45
Mains distribution board 45.1
Nordstraße; Röhrsdorfer Allee
in the planning stageUnder constructionConstruction completed
Distribution substation 45.7
Emile-Zola-Straße; Leipziger Straße; Siedlungsweg; Wildparkgasse
In planningunder construction
Network distribution point 45.11
Leipziger Straße; Querstraße; Wildparkstraße
in the planning stageUnder constructionConstruction completed
Distribution substation 45.12
Beethovenweg; Chemnitzer Straße; Genossenschaftsweg
In the planning stage
Distribution substation 45.13
Am Pleißenbach; Chemnitzer Straße; Eichenweg; Genossenschaftweg; Goetheweg; Lindenweg; Theodor-Körner-Straße
in the planning stage
Network distributor 45.14
Am Strauchhof; Chemnitzer Straße; Genossenschaftsweg; Goetheweg; Holzfällerweg
in the planning stageunder construction
Distribution substation 45.15
Beethovenweg; Chemnitzer Straße; Heinrich-Heine-Straße
in the planning stageunder construction
Network distribution point 45.16
Beethovenweg; Chemnitzer Straße; Heinrich-Heine-Straße; Mozartweg; Schulgasse; Schulstraße
in the planning stageunder construction
Distribution substation 45.18
Chemnitzer Straße; Goetheweg; Limbacher Straße; Rabensteiner Straße; Rathausplatz
in planningunder construction
Distribution substation 45.20
Beethovenweg; Kirchberg; Limbacher Straße; Schillergasse;
Sebastian-Bach-Gasse
in planningunder construction
Distribution substation 45.21
Goetheweg; Limbacher Straße
in the planning stageunder construction
Network distribution point 45.23
Goetheweg; Jack-London-Straße; Limbacher Straße
in the planning stageunder construction
Distribution substation 45.24
At Ludwigshof; Beethovenweg; Goetheweg; Limbacher Straße
in the planning stageUnder constructionConstruction completed
Distribution substation 45.25
Goetheweg; Gutsweg; Limbacher Straße; Wasserschänkenstraße
In the planning stageUnder constructionConstruction completed
Distribution substation 45.26
Beethovenweg; Wasserschänkenstraße
In planningunder constructionConstruction completed
Distribution substation 45.27
Leipziger Straße; Wasserschänkenstraße
In planningunder constructionConstruction completed
Distribution substation 45.29
Goetheweg; Haardt; Limbacher Straße; Löbenhainer Straße
In the planning stageUnder constructionConstruction completed
Distribution substation 45.30
Goetheweg; Haardt
In planningunder constructionConstruction completed
Point of Presence 47
Distribution board 47.4
Auerswalder Straße; Bornaer Straße; Wittgensdorfer Straße
in the planning stageUnder constructionConstruction completed
Distribution substation 47.6
Hölderlinstraße; Rilkestraße; Waldrand
In the planning stageUnder constructionConstruction completed
Distribution substation 47.7
Hölderlinstraße; Saarstraße; Waldrand
In planningUnder constructionConstruction completed
Distribution substation 47.10
Am Küchwald; Küchwaldring; Salzstraße; Sechserweg; Waldrand
In planningunder construction
Distribution substation 47.12
Wittgensdorfer Straße
in the planning stageunder construction
Network distribution point 47.14
Leipziger Straße; Paracelsusstraße; Wittgensdorfer Straße
in the planning stageunder construction
Network distribution point 47.15
Leipziger Straße; Louis-Otto-Straße
in the planning stageunder construction
Point of Presence 48
Distribution substation area 48.1
Chemnitzer Straße; Kornweg; Wittgensdorfer Straße
in the planning stageUnder constructionConstruction completed