Tree felling work in preparation for the flood damage repair measures on the Gablenzbach stream
In preparation for the flood damage repair measures on the Gablenzbach in the areas of "Krehersches Wehr", Adelsbergstraße 168-176 and the Adelsberg primary school sports ground, tree felling work is required.
This work is scheduled to begin on 6 February 2017 and be completed by 24 February 2017.
Preparatory clearing work will already begin on 31 January 2017.